Equipment used:
Evaporative air cooler (A.K.A. closed cooling tower)
The quantity of model fbss-833r1s is 15
Process parameters: total water flow of 5000m3/h, temperature drop of 42-32℃
Supporting equipment: blast furnace
Project:
Shougang co., LTD. Qianan iron & steel co., ltd. was incorporated on December 18, 2002 and completed and put into operation on October 15, 2004. Shougang co., LTD. (hereinafter referred to as shougang qian steel co., LTD.) is a large state-owned steel enterprise affiliated to shougang corporation. Located in qian 'an city, hebei province, shougang is the "hope project" for shougang to carry out strategic structural adjustment and realize sustainable development. Play a positive role in shougang relocation adjustment. The company was incorporated on December 18, 2002, laid the foundation stone on March 25, 2003, and held the completion and production ceremony on October 15, 2004. The 2160 hot rolling project started on March 31, 2005 and rolled out the first hot rolling coil in the development history of shougang on December 23, 2006, realizing the historic leap of shougang from low-end products to middle and high-end products.