Closed cooling tower in the actual use of a very wide range of applications, such a cooling tower, if you really want to install, then in the process of installation also want to have more installation steps.
1. Check the bottom
During the process of closed cooling tower for the actual installation, be sure to check at the bottom of the device and have a look at whether they accord with the requirement of construction drawing, and to see if they can at the same level for installation, the difference of the entire installation height, basically are in a mm or so, the middle distance difference is basically about two millimeters, and in the process of installing device must not use open flame, if necessary, must be used by the electric welding protective work.
2. When installing the closed cooling tower, it is necessary to weld the floor beside the feet or directly sit on some other floors.
3. After the relevant inspection, at the time of closed cooling tower for installation, must ensure that they are all in the same horizontal plane for installation, to put in the middle of the feed line of cultivated land, also want to adjust the direction of the water, and at the time of installation to after a leg or at the bottom of the tower body and filling material support for installation, and even better when installation to maintenance of gym work, when installation should consider closing bracket of water or other water receiver, at the same time of closed cooling tower for installation, want to consider more device fan, or even want to consider some fixed bolt, Or some of the other intake walls are bolted down to provide more protection. After the installation of the closed cooling tower, it can completely operate normally.