您好!欢迎访问Jiangsu zhuodun heat transfer technology co. LTD的企业网站!
联系我们
  • Jiangsu zhuodun heat transfer technology co. LTD
  • 电话:0510-83597448
  • 手机:13921183846
  • 邮箱:13921183846@139.com
  • 地址:1 wanxiang road, zhenbei industrial park, luoshe town, huishan district, wuxi city, jiangsu province

What should be noticed before operation of closed cooling tower?

时间:2022-11-10 阅读:88

Closed cooling tower in the actual operation, more or less have their own some precautions, this equipment before the operation of a lot of places to pay extra attention to, this is a lot of people want to know.

(1) if the closed cooling tower is really to be operated, then some pollutants in the sealed area must be completely excluded from the outside.

(2) while the closed cooling tower is in practice, make sure there is enough clearance at the tail or other places. And basically while they're running, make sure that they're not going to cause a whole bunch of damage, so try to avoid damage because of human factors.

(3) when the closed cooling tower is actually inspected, it is also necessary to check whether it is on the same level with each other.

(4) after the completion of the closed cooling tower inspection operation, there are intermittent start switches, and to check whether the windmill operation is correct, to see if they have abnormal noise generation.

(5) during the actual use or inspection of the closed cooling tower, the hot water tray and some debris inside must be cleaned.

(6) it is very important to clean the dirt of the closed cooling tower, after which the relevant position must be filled.

(7) indirectly start the circulation system of the closed cooling tower to remove all the air in the pipe until the pipe or the cold water tray is filled with circulating water.

(8) after the closed cooling tower is re-operated, the water in the cold water pan will be adjusted slightly, and their adjustment will be adjusted according to the actual situation.

(9) it is better to re-confirm the circuit switch according to the closed cooling tower circuit system, and see whether the fuse or other wiring is suitable.